Skip to main content
Studio Marks
Studio Marks Studio Marks

Steel structure completed on the 10,000 m² stage

2017-03-21

On 22 March 2017, the steel structure of the 10,000-square-metre stage was topped out, creating a major environment for large-scale scenic builds.