International standard studio

Studio area:1000 square meters
Number of studios:5 seats
Ground load:The load of the wooden or cement floor in the center of the photography studio is 30KN per square meter, which is 3 tons per square meter; Part of the shed center is equipped with deep pits, which can extend the height of the landscape, facilitate the installation of low machine positions, and can also be used as underground pits, basements, temporary water pools, etc; The load on the cover plate of the deep pit is 5KN per square meter, which is 500KG/㎡.
Shed length and width:25.2 meters x 36 meters
Shed height:12.5 meters, clear height (from the ground to below the suspension)
Hanging:The sliding rail beam is convenient for setting up scenery, lighting equipment, and pressure, with a load of 500KG per point and an average of 250KG per meter. The load of the track changing trolley is 50KG;
Electricity load:Studio lighting load: 1600A/380V; Total load up to: 2017A/380V
distribution:The first floor of the shed is equipped with 100KW lighting distribution boxes on all four sides, and the pedestrian bridge floor is equipped with 200KW lighting distribution boxes on all four sides. The electrical load of the shed can completely avoid the use of power generation cars, and the voltage is stable to meet the needs of different machines;
Auxiliary rooms:Each studio or setting workshop is equipped with auxiliary rooms, including hair and makeup rooms, VIP waiting rooms, standard waiting rooms, clothing rooms, offices, and other functions, which can ensure that different departments of the crew work together in a centralized manner, realizing the desire of the main creators to arrive at the set or lounge in 10 seconds, saving time, and improving work efficiency;
Soundproof door:One location: 6 meters x 6 meters
Simultaneous recording:The sound insulation standard for the studio is NR25, which can meet the needs of simultaneous recording;
air conditioner:In addition to being equipped with radiators to maintain a basic anti freezing room temperature, the central and annex rooms are also equipped with silent cold and hot air conditioning to ensure a room temperature of around 23 ℃ without affecting simultaneous recording; There are also mobile air conditioners available for local cooling; Central air conditioning and mobile air conditioning can be used together to ensure the daily operation or shooting of a standard skating rink (such as the cast of snow pear Stewed with Rock Candy);
Exhaust:The center of the shed is equipped with a ventilation and smoke exhaust system, which can clear the smoke in about 15-30 minutes and achieve rapid scene switching;
fire control:Each building is equipped with complete fire-fighting facilities, combined with a fire control room and dedicated safety personnel, which can greatly enhance the guarantee of safe production for the crew;
IT/Communication
Secure wired and wireless internet connections
Telephone and video conferencing services
A stable and secure network system
Secure and high-speed file transfer
Data center equipment
Other
Ma Dao and Mao Dong